I'm currently waiting on a custom Shires horn. The original production time was suppose to be 4 months. They have already extended that 3 times. I should be getting the horn next week, but now they are saying the middle of February. I understand things happen, but is this typical for new instruments? It seems excessive. And by now Covid really shouldn't be used as an excuse beyond the original long lead time.

In my line of work this would cost me pretty much all of my business and I wouldn't have any customers left. And I'm not certain they aren't going to extend it again.

I accepted the original lead time, but if it gets pushed out much further I might pull the order. I'm just not sure if I can get a similar spec horn any faster through another company.

I guess I would just like to know other's opinions and experiences when ordering custom horns. This is my first brand new horn and first customized for me.

Thanks!
sstelmack
User avatar
BGuttman
Posts: 6793
Joined: Thu Mar 22, 2018 7:19 am
Location: Cow Hampshire

Re: Production wait times

Post by BGuttman »

There was a time where you plunked your money down on a Shires and waited 2 years1 :eek: :eek:

There are a few things that could be affecting your delivery. It could be on a shipping container waiting outside Los Angeles harbor (a lot of Q instruments are assembled in China). The COVID epidemic has hit a new wave in New England and there may be a lack of labor at the Hopedale MA shop. They could just be experiencing high demand and if you ordered something exotic it may be delayed.

I agree that these continual delays are infuriating. Problem is they seem to be endemic in this plague-infested time. I'd bet you would have similar problems if you ordered a car or major appliance.
Bruce Guttman
Merrimack Valley Philharmonic Orchestra
"Almost Professional"
User avatar
Doug Elliott
Posts: 3640
Joined: Wed Mar 21, 2018 10:12 pm
Location: Maryand

Re: Production wait times

Post by Doug Elliott »

I don't know the situation at Shires, but stuff happens... people get sick or have other obligations, machines go down, supplies and tools don't always arrive when you need them. Production schedules get upset by lots of things.

In my own shop, the machine I use has been down for over 4 months now due to various electronic problems. I will probably get it running today, or at least this week. It takes a long time to recover.
"I know a thing or two because I've seen a thing or two."
User avatar
DougHulme
Posts: 520
Joined: Fri Apr 27, 2018 12:54 am
Location: Portsmouth UK
Contact:

Re: Production wait times

Post by DougHulme »

Jaguar Land Rover, in the UK, are currently selling £80,000 Range Rovers without numerous chips in them along with the promise that when the chips arrive the main dealer will fit them imeadiately. I assume they will have taken all the bulbs out that should be lighting up in the meantime!!... 'stuff' happens... Doug
User avatar
paulyg
Posts: 684
Joined: Thu May 17, 2018 12:30 pm

Re: Production wait times

Post by paulyg »

In my line of business, we have had to adjust to vendors simply not being able to deliver common off-the-shelf items. Everyone is having a bad time over this- businesses, vendors, customers, you name it.

It's OK to feel frustrated, but please also acknowledge that the situation is not unique to Shires. Folks who ordered cars are facing similar extended lead times, and automotive is not exactly a cottage industry. Your only safe bet is to get something that's in stock, probably at a hefty markup, but even then you're probably not going to wind up with exactly what you want, whether it's a car or a trombone (or a National Instruments compact daq chassis, but that's just me thinking about work).
Paul Gilles
Aerospace Engineer & Trombone Player
Vegasbound
Posts: 1174
Joined: Sat Jul 06, 2019 6:11 am

Re: Production wait times

Post by Vegasbound »

Be patient, the horn will be worth the frustrating wait, then you can spend hours and hours practicing to your hearts content.
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

Thank you all for the input. I do understand things are crazy at the moment. I will try to be patient. I would have just thought they would have worked all this into the original time line. It's the extra extensions that are driving me nuts. At this rate I'm going to get it after my current concert season and have to wait until next year to use it.
User avatar
spencercarran
Posts: 661
Joined: Sat Oct 17, 2020 1:02 pm
Location: Chicago

Re: Production wait times

Post by spencercarran »

Heck, I've been waiting months for a big retailer to deliver a pretty basic euphonium gig bag. Everybody's slammed, nobody's caught up with all their obligations. It sucks, but there's nothing much to do other than extend grace and understanding to each other.
Digidog
Posts: 374
Joined: Thu Dec 13, 2018 3:31 pm

Re: Production wait times

Post by Digidog »

I have a custom Shires on order since late September. Just the other day I got a notification email that my horn is expected to ship late this month (December). The email was originally sent by Shires and forwarded to me through my vendor, but I have to take their word for it and that they genuinely mean to ship it soon.

Then again, I hear from acquaintances in the transportation business that shipping is in deep troubles worldwide; that there is a lack of containers, a shortage of personnel for the freighters and for the shipping companies, and that prices all through the chain of sending and handling have skyrocketed. So in the end, I really don't know what to expect.

All I can say is it seems that I placed my order at the right moment, because the quoted wait time was due about now and to me that isn't a very long wait. When I ordered a Master Built Strat (from Fender), I got a quote time for fourteen months, and I know some guitar builders - or even companies - have waiting times over two years. In the guitar world that seems to be fairly normal - or at the least not uncommon nor deterring. In fact: at guitar foras there are constantly stories of people having to wait several years, with huge down payments invested and great woes whether their instrument ever will be built or if they've fallen for a scam or a dishonest builder.

To the OP: I wouldn't let a prolonged wait discourage me. I have had so much direct and indirect email contact with Shires to trust them in doing their best with your order. However: It's your purchase, your order and your money, so I can only wish you the best and to ultimately finding the right desicion from what you want. I, personally, wouldn't think that any other manufacturers would fare any better, given all the chaos and havoc this pandemic has brought on. Good luck!
Welcome to visit my web store: https://www.danieleng.com/

Big Engband on Spotify: https://open.spotify.com/artist/30Vuft1 ... me3sZi8q-A
User avatar
harrisonreed
Posts: 5575
Joined: Fri Aug 17, 2018 12:18 pm
Location: Fort Riley, Kansas
Contact:

Re: Production wait times

Post by harrisonreed »

Edwards delivered on time. They said three months, and it happened. They weren't waiting on parts made in the USA shipped to be assembled in China that needed to be shipped back to MA for finishing. You get what Eastman paid for.

You will get a great horn, I'm sure, but you pay for it in time to cut costs for Eastman.
Last edited by harrisonreed on Thu Dec 23, 2021 3:21 pm, edited 1 time in total.
Arvopart17
Posts: 270
Joined: Thu Jul 02, 2020 11:54 am
Location: New Hampshire

Re: Production wait times

Post by Arvopart17 »

It’s not just the custom shops, I ordered a replacement slide for a 2b+ From Conn in July this year and finally canceled the order in late November because it still wasn’t ready. I found a good used one instead. Waiting can stink, but it’s worth it for the right instrument.
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

Digidog, I am happy your order seems to be coming in on time, but that is almost more frustrating for me. My order went in on the first day of September. I would have to wonder why orders would be taken out of order.

Also, in the consideration of shipping. I really think this shouldn't affect my order. I ordered a custom series horn and the customs never leave the states like the Q series do. And I was under the impression that all the parts for them are made and assemble here. I was actually quite happy that I found a fully American made horn that I liked.
User avatar
hyperbolica
Posts: 3343
Joined: Fri Mar 23, 2018 7:31 am

Re: Production wait times

Post by hyperbolica »

This is just me, but I've always felt Shires were adequate but never really outstanding. I'd check with M&W for something worth the wait.
Thrawn22
Posts: 1378
Joined: Wed Sep 05, 2018 10:18 pm

Re: Production wait times

Post by Thrawn22 »

I have a friend who went to BAC (god knows why) and placed and order in July and has yet to hear anything about it. He made a deposit too.
6H (K series)
Elkhart 60s' 6H bell/5H slide
78H (K series)
8H (N series bell w/ modern slide)
88HN
71H (dependant valves)
72H bell section (half moon)
35H alto (K series)
Boneyard custom .509 tenor
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

I couldn't find any info on M&W. I've checked their site and their work looks amazing. I would like to see some third party reviews or input.

As for shires. Out of every horn I've been able to get my hands on they were the one that fit the best for me.
User avatar
LeTromboniste
Posts: 1334
Joined: Wed Apr 11, 2018 7:22 am
Location: Fribourg, CH
Contact:

Re: Production wait times

Post by LeTromboniste »

Orders are almost always fulfilled out of order. For one thing, makers don't typically build each instrument individually from scratch to finish, they're making parts in batches. If someone's order includes parts they already are making for others, their instrument might end up being ready before another ordered earlier, for instance.
Maximilien Brisson
www.maximilienbrisson.com
Lecturer for baroque trombone,
Hfk Bremen/University of the Arts Bremen
mrdeacon
Posts: 1115
Joined: Tue May 08, 2018 2:05 am
Location: Los Angeles, California

Re: Production wait times

Post by mrdeacon »

LeTromboniste wrote: Thu Dec 23, 2021 4:49 pm Orders are almost always fulfilled out of order. For one thing, makers don't typically build each instrument individually from scratch to finish, they're making parts in batches. If someone's order includes parts they already are making for others, their instrument might end up being ready before another ordered earlier, for instance.
This! Especially if OP ordered something out of the norm like dependent valves or a handslide to custom specs. The fully custom horns will take longer than the "stock" custom horns.
Rath R1, Rath R3, Rath R4, Rath R9, Minick Bass Trombone
User avatar
harrisonreed
Posts: 5575
Joined: Fri Aug 17, 2018 12:18 pm
Location: Fort Riley, Kansas
Contact:

Re: Production wait times

Post by harrisonreed »

OP what horn did you order?
User avatar
harrisonreed
Posts: 5575
Joined: Fri Aug 17, 2018 12:18 pm
Location: Fort Riley, Kansas
Contact:

Re: Production wait times

Post by harrisonreed »

Doug Elliott wrote: Thu Dec 23, 2021 10:52 am I don't know the situation at Shires, but stuff happens... people get sick or have other obligations, machines go down, supplies and tools don't always arrive when you need them. Production schedules get upset by lots of things.

In my own shop, the machine I use has been down for over 4 months now due to various electronic problems. I will probably get it running today, or at least this week. It takes a long time to recover.

🤞🤞
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

I ordered a Ralph Sauer model with a different slide and lead pipe. I don't think anything was out of the ordinary.
User avatar
Burgerbob
Posts: 5488
Joined: Mon Apr 23, 2018 8:10 pm
Location: LA
Contact:

Re: Production wait times

Post by Burgerbob »

sstelmack wrote: Thu Dec 23, 2021 5:55 pm I ordered a Ralph Sauer model with a different slide and lead pipe. I don't think anything was out of the ordinary.
Could be as simple as them waiting on the screwbell case to come in.
Aidan Ritchie, LA area player and teacher
tbonesullivan
Posts: 1747
Joined: Tue Jul 02, 2019 9:06 am
Location: New Jersey
Contact:

Re: Production wait times

Post by tbonesullivan »

sstelmack wrote: Thu Dec 23, 2021 10:26 amAnd by now Covid really shouldn't be used as an excuse beyond the original long lead time.
Covid continues to be a major issue worldwide, resulting in ever increasing lead times for just about everything. Combine this with lots of shortages from simple things like materials to things like control modules for CNC machines.

Also demand for a lot of things did not fall, like so many companies thought it would, which resulted in massive shortages.

Has Shires gotten any more specific regarding what is causing the delay?
David S. - daveyboy37 from TTF
Bach 39, LT36B, 42BOF & 42T, King 2103 / 3b, Kanstul 1570CR & 1588CR, Yamaha YBL-612 RII, YBL-822G & YBL-830, Sterling 1056GHS Euphonium,
Livingston Symphony Orchestra NJ - Trombone
User avatar
harrisonreed
Posts: 5575
Joined: Fri Aug 17, 2018 12:18 pm
Location: Fort Riley, Kansas
Contact:

Re: Production wait times

Post by harrisonreed »

Take the chip shortage for example -- I was really looking forward to getting my first real camera and Sony has indefinitely suspended production of the model I want because there are no chips.

Image

Image
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

I may have miss spoke. By saying it should not be an issue by now I mean that it should be figured into the process. When I first ordered the horn and they gave me the lead time, one of the things they said was due to Covid it is a bit longer than they wanted. I may be remembering it wrong, but I thought they said that they put in an extra month for cushion. The thing I don't like is the additional time. I was the market for a horn in September for my upcoming concert season. With the timeline I was given I thought I would have the horn just before my first concert and then be able to wrap up the season with it. I didn't like it but decided I would limp along on my old horn for a bit longer. At this point, if they add any more time to the wait I might be past my season. As of right now I have not heard any reasons for the delay, just that it is now scheduled for completion in mid February. It may sound petty to a lot of you, but if the estimated time was quoted at 5 to 6 months in the first place I probably would have moved on and found another horn.
LIBrassCo
Posts: 517
Joined: Sun Feb 24, 2019 5:34 am
Location: Long Island, NY
Contact:

Re: Production wait times

Post by LIBrassCo »

Things happen. I know personally I am behind. Got hit with an emergency appendectomy, post operative complications, got back in the shop just to get the flu, then had to take care of my 5 year old while she had it. That rolled into her being quarantined for covid exposure shortly after, and having to help her with virtual school daily. Im sure it sounds fairly bogus for anyone waiting for something from me, and I've done the best i can to get back on schedule, but sometimes there's no avoiding stuff.
Check out our new Pollard Sarastro line of mouthpieces: https://www.librassco.com/pollard-signature-series
OneTon
Posts: 666
Joined: Tue Nov 02, 2021 11:44 am

Re: Production wait times

Post by OneTon »

One of the problems with sending rank amateurs on the Challenger mission was that rank amateurs have no way to understand the risks of the mission, as might be expected of a career military pilot. It later turned out that NASA had got it wrong as well when the tiles were falling off and damaging the wing on acquiring their orbit. In any case, military pilots tended to know the history of the F-105, why it was called the “Thud,” and the limitations of technology at a given time. A military pilot could assess the dangers of making a space flight. A civilian might not.

Before I blame a supplier for not having a crystal ball, I would be asking myself what was my responsibility in this event. Did I not listen? Did I only hear what I wanted to here. Did I write out a case study to determine what were the risks and their impacts to the desired goal? If I did not, what would it have looked like had I done so?

Am I a good customer?
Richard Smith
Wichita, Kansas
ngrinder
Posts: 262
Joined: Tue Apr 24, 2018 7:30 pm
Location: New York City
Contact:

Re: Production wait times

Post by ngrinder »

harrisonreed wrote: Thu Dec 23, 2021 3:05 pm They weren't waiting on parts made in the USA shipped to be assembled in China that needed to be shipped back to MA for finishing. You get what Eastman paid for.

You will get a great horn, I'm sure, but you pay for it in time to cut costs for Eastman.
Is that the M.O. with the Custom horns these days? They're fabricated in MA, assembled in China, and then touched up back in the US? I didn't realize this.
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

I own a business. I am proud of the fact that my company hits it's deadlines. We are not perfect, but one thing we do is never state a timeline that we know we can't make. After the crazy year we all have had we have adjusted our system. And I feel we have gotten pretty good at the adjustments by now. If something comes up that we can't control we make it very clear to our clients what is going on. I'm sorry if people don't like that some of us hold companies to what they say.
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

ngrinder wrote: Thu Dec 23, 2021 8:50 pm
harrisonreed wrote: Thu Dec 23, 2021 3:05 pm They weren't waiting on parts made in the USA shipped to be assembled in China that needed to be shipped back to MA for finishing. You get what Eastman paid for.

You will get a great horn, I'm sure, but you pay for it in time to cut costs for Eastman.
Is that the M.O. with the Custom horns these days? They're fabricated in MA, assembled in China, and then touched up back in the US? I didn't realize this.
No it isn't. That is what the do for the Q series. The custom line is suppose to be done totally in house in Boston.
User avatar
paulyg
Posts: 684
Joined: Thu May 17, 2018 12:30 pm

Re: Production wait times

Post by paulyg »

sstelmack wrote: Thu Dec 23, 2021 9:00 pm
ngrinder wrote: Thu Dec 23, 2021 8:50 pm

Is that the M.O. with the Custom horns these days? They're fabricated in MA, assembled in China, and then touched up back in the US? I didn't realize this.
No it isn't. That is what the do for the Q series. The custom line is suppose to be done totally in house in Boston.
You're kidding yourself if you think that the custom instruments are made totally independent of the China-based operations at this point.
Paul Gilles
Aerospace Engineer & Trombone Player
User avatar
harrisonreed
Posts: 5575
Joined: Fri Aug 17, 2018 12:18 pm
Location: Fort Riley, Kansas
Contact:

Re: Production wait times

Post by harrisonreed »

ngrinder wrote: Thu Dec 23, 2021 8:50 pm
harrisonreed wrote: Thu Dec 23, 2021 3:05 pm They weren't waiting on parts made in the USA shipped to be assembled in China that needed to be shipped back to MA for finishing. You get what Eastman paid for.

You will get a great horn, I'm sure, but you pay for it in time to cut costs for Eastman.
Is that the M.O. with the Custom horns these days? They're fabricated in MA, assembled in China, and then touched up back in the US? I didn't realize this.
No I would have thought the Q series would be the one with delivery issues.

They make the bells, tubing, and valve sections in house for the custom horns, according to their website. That means everything else is likely imported, but honestly that's not a big deal. It would be a waste of time to be machining nuts and spit valve keys in a tiny shop. Could be what the holdup is still, though -- bracing and small parts not available.
Digidog
Posts: 374
Joined: Thu Dec 13, 2018 3:31 pm

Re: Production wait times

Post by Digidog »

sstelmack wrote: Thu Dec 23, 2021 3:28 pm Digidog, I am happy your order seems to be coming in on time, but that is almost more frustrating for me. My order went in on the first day of September. I would have to wonder why orders would be taken out of order.

Also, in the consideration of shipping. I really think this shouldn't affect my order. I ordered a custom series horn and the customs never leave the states like the Q series do. And I was under the impression that all the parts for them are made and assemble here. I was actually quite happy that I found a fully American made horn that I liked.
I'm sorry for unnecessarily upsetting you, because I just saw that I misread the transaction dates from my account: I ordered the horn in late August! The 26:th to be precise.

The first delivery quote I got, was late November, but that was quickly postponed. By then I had already talked to an acquaintance of mine who works with international logistics, whom told me that both domestic (Swedish) and international shipping were in a state of chaos, and that that chaos would persist well into 2022. To be honest, I've ordered many things with international shipping during 2021 (books, artist materials, amps and miscellaneous musical gear a.o.) and have never had or noticed any obvious delays or problems.

Also to mention, is that the response from Shires to my order was that they seemed to have no significant delays regarding materials, building or administration - nor forseeing any. As I percieved it from them, they seemed to have openings in their production due to decreasing demand and sales during the pandemic.

I have no idea if I've gotten everything wrong, but if there are significant differences in specifications between your horn and mine, that would be the only notable difference I could see that could explain why your order and mine differ in delivery time. Unless Shires got a drastic order increase in the time in between.
Last edited by Digidog on Fri Dec 24, 2021 9:51 am, edited 2 times in total.
Welcome to visit my web store: https://www.danieleng.com/

Big Engband on Spotify: https://open.spotify.com/artist/30Vuft1 ... me3sZi8q-A
sstelmack
Posts: 40
Joined: Thu Dec 23, 2021 10:04 am

Re: Production wait times

Post by sstelmack »

Oh no worries, I'm not really upset. Just a bit peeved.

When I talked to them they quoted that they were at 3 months but quoting 4 to be more safe, so it lines up with what you say.

I appreciate your (and the other's) input. It did help.

I'm going to bite my lip and just wait for the horn. Unless something goes really nuts...

As far as I'm concerned Shires has been great to work with besides this one hiccup. I hope I didn't taint anyone's opinion on them. I'll just have to adjust my timelines in the future if I need anything.
asmith
Posts: 74
Joined: Sat Dec 04, 2021 10:44 am
Location: Maryland

Re: Production wait times

Post by asmith »

I know Shires was doing a large expansion on their factory last I heard from our rep. So that could be adding to the delay. They did announce the Custom Euphonium so I imagine they are tooling up for large scale production on those.

Also I have heard from several companies that metal suppliers are low on stock in some alloys. Most of the brass used by manufacturers comes from overseas, either Asia or Europe. The only company that is actually sourcing from the states right now is Conn-Selmer for any American made product line.
Crazy4Tbone86
Posts: 1519
Joined: Tue Jan 14, 2020 10:52 am

Re: Production wait times

Post by Crazy4Tbone86 »

I sent a 1930s Conn euphonium valve cluster (4-valve oval port) to a business for a valve rebuild when my son was in 5th grade band. I was hoping the valves would be done in time for my son to play the instrument in 6th grade band.

The business still has not completed the valve cluster. My son is presently a junior…….in college.

I have been calling the business every two weeks and we have a lovely conversation every time. They always claim that the valve cluster will be “ready in two weeks.” This has been going on for about 10 years. On the positive side, they do feel bad about the delay and have promised to complete the job for free.
Brian D. Hinkley - Player, Teacher, Technician and Trombone Enthusiast
User avatar
deanmccarty
Posts: 193
Joined: Tue May 01, 2018 10:20 am
Location: Texas
Contact:

Re: Production wait times

Post by deanmccarty »

I ordered a BAC back when Mike was just starting out… I was told 4-6 months… after LOTS of little to no communication I finally received my horn 17 months after ordering it… I chalked it up to growing pains for him.

Recently, I ordered a contrabass from Jürgen Voigt in Germany… I was told 10 weeks originally… I placed the order in February… it finally was shipped to Hornguys at the end of August… unfortunately it was damaged… so it went back to Germany… I finally received it around Thanksgiving. I wasn’t too upset about it all… with delays in all directions due to COViD it’s understandable.

In the end you will be glad you waited. Hang in there!
Dean McCarty
“Have a good time... all the time.” - Viv Savage, Spinal Tap :cool:
VoigtBrass Artist

Rath R9D, LIB 750
Voigt 188-FXG, LIB 525/550
Rath R10, LIB custom
Voigt 711, LIB custom
Voigt 173-FGg-K, LIB standard contra
ngrinder
Posts: 262
Joined: Tue Apr 24, 2018 7:30 pm
Location: New York City
Contact:

Re: Production wait times

Post by ngrinder »

harrisonreed wrote: Thu Dec 23, 2021 11:21 pm
ngrinder wrote: Thu Dec 23, 2021 8:50 pm

Is that the M.O. with the Custom horns these days? They're fabricated in MA, assembled in China, and then touched up back in the US? I didn't realize this.
No I would have thought the Q series would be the one with delivery issues.

They make the bells, tubing, and valve sections in house for the custom horns, according to their website. That means everything else is likely imported, but honestly that's not a big deal. It would be a waste of time to be machining nuts and spit valve keys in a tiny shop. Could be what the holdup is still, though -- bracing and small parts not available.
Ah, I misread what you wrote. Agreed about the Q Series stuff.
MikeS
Posts: 16
Joined: Wed Jul 01, 2020 8:04 pm

Re: Production wait times

Post by MikeS »

It could be worse. Chris Wilkes makes wooden flutes that are works of art as well as fantastic players.

http://wilkesflutes.co.uk/flutes.html

When his wait list got to seventeen years he decided that he would either be retired or deceased by then and simply stopped accepting orders.
User avatar
harrisonreed
Posts: 5575
Joined: Fri Aug 17, 2018 12:18 pm
Location: Fort Riley, Kansas
Contact:

Re: Production wait times

Post by harrisonreed »

MikeS wrote: Fri Dec 24, 2021 8:39 pm It could be worse. Chris Wilkes makes wooden flutes that are works of art as well as fantastic players.

http://wilkesflutes.co.uk/flutes.html

When his wait list got to seventeen years he decided that he would either be retired or deceased by then and simply stopped accepting orders.
What, he is too stuck up to take on an apprentice?
User avatar
bassclef
Posts: 259
Joined: Fri Mar 23, 2018 8:30 am
Location: Ohio, USA

Re: Production wait times

Post by bassclef »

harrisonreed wrote: Fri Dec 24, 2021 9:38 pm What, he is too stuck up to take on an apprentice?
I've never heard of him before this thread. I spent 90 seconds on his website and now I feel confident that I know the answer to that question.
andym
Posts: 121
Joined: Sun Dec 23, 2018 3:03 am

Re: Production wait times

Post by andym »

There’s a guitar maker in the San Francisco Bay Area who makes extremely creative, unusual instruments. He has a waiting list but just makes what he is moved to make and then goes down the waiting list and matches the instrument to someone who wanted something along those lines. It’s not a usual business model but it works for him.
The user formerly known as amichael on TTF.
User avatar
ithinknot
Posts: 1112
Joined: Fri Jul 24, 2020 3:40 pm

Re: Production wait times

Post by ithinknot »

bassclef wrote: Fri Dec 24, 2021 11:20 pm
MikeS wrote: Fri Dec 24, 2021 8:39 pm It could be worse. Chris Wilkes makes wooden flutes that are works of art as well as fantastic players.

http://wilkesflutes.co.uk/flutes.html

When his wait list got to seventeen years he decided that he would either be retired or deceased by then and simply stopped accepting orders.
harrisonreed wrote: Fri Dec 24, 2021 9:38 pm What, he is too stuck up to take on an apprentice?
I've never heard of him before this thread. I spent 90 seconds on his website and now I feel confident that I know the answer to that question.
Your http-based personality divination notwithstanding, this phenomenon is very common among instrument makers, especially in the UK. The employer regulations on workspace layout, equipment specifications and safety make it prohibitively expensive for many people who originally set up solo to take on an apprentice (or to expand with extra staff). I have several colleagues who would love to have trained apprentices but who would need to have relocated and replaced the majority of their toys to do so. Depending on your outlook, this is either the heavy hand of government choking the small business owner, or a regrettable side-effect of reasonable laws intended to prevent a 16 year old losing a hand on their first day :good:
User avatar
harrisonreed
Posts: 5575
Joined: Fri Aug 17, 2018 12:18 pm
Location: Fort Riley, Kansas
Contact:

Re: Production wait times

Post by harrisonreed »

bassclef wrote: Fri Dec 24, 2021 11:20 pm
harrisonreed wrote: Fri Dec 24, 2021 9:38 pm What, he is too stuck up to take on an apprentice?
I've never heard of him before this thread. I spent 90 seconds on his website and now I feel confident that I know the answer to that question.
Yeah, if your wait-list is 17 years, you aren't charging enough AND your customers don't actually need to use your product. "I definitely need this flute once my career is over and you're possibly dead, Chris"

😒

Riiiiiight.

If you're flute is THAT good, people will pay more if they actually need it. It might be! People pay 42 quintrillions dollars for strad violins. Then people/institutions who really need your product don't have to wait 17 years. And maybe you can, like, hire a deserving apprentice. I don't know how bad the regulations are in the UK, but you can't tell me that selling a $300,000 flute wouldn't be enough to overcome that. Likewise, what are you doing, thinking the flute you need now is the flute you'll need 17 years from now? Crazy.
User avatar
ithinknot
Posts: 1112
Joined: Fri Jul 24, 2020 3:40 pm

Re: Production wait times

Post by ithinknot »

harrisonreed wrote: Sat Dec 25, 2021 5:25 am Yeah, if your wait-list is 17 years, you aren't charging enough AND your customers don't actually need to use your product. "I definitely need this flute once my career is over and you're possibly dead, Chris"

😒

Riiiiiight.

If you're flute is THAT good, people will pay more if they actually need it. It might be! People pay 42 quintrillions dollars for strad violins. Then people/institutions who really need your product don't have to wait 17 years. And maybe you can, like, hire a deserving apprentice. I don't know how bad the regulations are in the UK, but you can't tell me that selling a $300,000 flute wouldn't be enough to overcome that. Likewise, what are you doing, thinking the flute you need now is the flute you'll need 17 years from now? Crazy.
Haha. I'm not saying it isn't preposterous... but you're also ignoring a) the Idea of Art, which is as real as you want it to be, and b) the fact that no one really Needs Needs any of these things. When it's this long a wait, the buyer may be just as interested in supporting the creator, and the creation of something wonderful that will outlive them. I mean, you'd cope just fine on an 88H.

And plenty of people don't want to be The $300k Guy, even if they could get away with it. Unless you're some sort of Randian psychopath, this is commendable.

FWIW, my harpsichord teacher waited exactly 17 years for an instrument. The circumstances were specific - the builder was The original and preeminent European maker of the post-war revival, and also a friend - and as far as 'the flute you need' goes, you weren't placing The Order on day 1, you were taking a place on the list and deciding what you wanted when the time came. Was it worth it? It's one of maybe the three best instruments I've ever played. (And he was building better instruments in 1985 than in 1968 when the order was placed :pant: )

As business, though, of course it's ridiculous. I wouldn't choose to live with perpetual obligations hanging over me, especially if any money had already changed hands.

(Obviously, this all only applies to sole trader artist/craftspeople... if you're Shires, just give more pessimistic delivery timescales, and then surprise people by occasionally overperforming.)

Happy Christmas.
Last edited by ithinknot on Sat Dec 25, 2021 9:24 am, edited 1 time in total.
User avatar
Burgerbob
Posts: 5488
Joined: Mon Apr 23, 2018 8:10 pm
Location: LA
Contact:

Re: Production wait times

Post by Burgerbob »

harrisonreed wrote: Fri Dec 24, 2021 9:38 pm
MikeS wrote: Fri Dec 24, 2021 8:39 pm It could be worse. Chris Wilkes makes wooden flutes that are works of art as well as fantastic players.

http://wilkesflutes.co.uk/flutes.html

When his wait list got to seventeen years he decided that he would either be retired or deceased by then and simply stopped accepting orders.
What, he is too stuck up to take on an apprentice?
This is exactly why the constant growth capitalism model is so insidious. There's no reason this guy needed to expand and make more flutes, but we all feel like he should because...?
Aidan Ritchie, LA area player and teacher
Dennis
Posts: 346
Joined: Sat Mar 24, 2018 6:23 pm
Location: Cincinnati, Ohio, USA

Re: Production wait times

Post by Dennis »

LIBrassCo wrote: Thu Dec 23, 2021 8:08 pm Things happen. I know personally I am behind. Got hit with an emergency appendectomy, post operative complications, got back in the shop just to get the flu, then had to take care of my 5 year old while she had it. That rolled into her being quarantined for covid exposure shortly after, and having to help her with virtual school daily. Im sure it sounds fairly bogus for anyone waiting for something from me, and I've done the best i can to get back on schedule, but sometimes there's no avoiding stuff.
It doesn't sound bogus at all to me. (Disclaimer: I'm not waiting on stuff from you, but I am waiting on stuff from contractors with similar stories.) Stuff happens, and in pandemic times there is one more club for reality to clobber us with. I hope your customers/clients are patient with you.
Dennis
Posts: 346
Joined: Sat Mar 24, 2018 6:23 pm
Location: Cincinnati, Ohio, USA

Re: Production wait times

Post by Dennis »

OneTon wrote: Thu Dec 23, 2021 8:29 pm One of the problems with sending rank amateurs on the Challenger mission was that rank amateurs have no way to understand the risks of the mission, as might be expected of a career military pilot. It later turned out that NASA had got it wrong as well when the tiles were falling off and damaging the wing on acquiring their orbit. In any case, military pilots tended to know the history of the F-105, why it was called the “Thud,” and the limitations of technology at a given time. A military pilot could assess the dangers of making a space flight. A civilian might not.

Before I blame a supplier for not having a crystal ball, I would be asking myself what was my responsibility in this event. Did I not listen? Did I only hear what I wanted to here. Did I write out a case study to determine what were the risks and their impacts to the desired goal? If I did not, what would it have looked like had I done so?

Am I a good customer?
(Emphasis added)

You have your shuttle disasters mixed up. Challenger was the solid rocket booster (SRB) failure, Columbia was the re-entry disaster due to wing damage.

The Challenger incident was actually much worse than you suggest. If you'd like a scientist's assessment devoid of bureaucratic input and control, read Feynman's What Do You Care What Other People Think?. (The second half of the book is about the Challenger disaster and the Rogers Commission.) The bottom line is that NASA and Thiokol engineers knew that there were serious problems with the SRBs, and communicated those problems to NASA management. They knew the dangers were increased at low temperatures and attempted to scrub the launch: there was ice on the SRBs. NASA's management overruled the engineers. The net result was seven dead astronauts, including a schoolteacher.

Feynman felt that his estimated probability of a catastrophic launch failure of around 1/100 was an acceptable failure rate. His primary objection was to NASA completely fictitious assessment of 1/100,000 being presented to non-professionals as an argument from authority (trust us, we're professionals and we know what we're doing). Basically, he felt they should have told McAuliffe (and everyone else) that there was a 1% chance of the thing blowing up, and allowed her (and everyone else) to make their own decisions.

The Columbia disaster showed that NASA still had a long way to go in cleaning up its act.

In response to your last question, yes, you are a good customer.
User avatar
ithinknot
Posts: 1112
Joined: Fri Jul 24, 2020 3:40 pm

Re: Production wait times

Post by ithinknot »

Burgerbob wrote: Sat Dec 25, 2021 8:08 am
harrisonreed wrote: Fri Dec 24, 2021 9:38 pm What, he is too stuck up to take on an apprentice?
This is exactly why the constant growth capitalism model is so insidious. There's no reason this guy needed to expand and make more flutes, but we all feel like he should because...?
Yup. Simply doing a thing well, at a scale that supports whomever one needs to support, shouldn't be a countercultural anomaly. (There's also the small matter of relentless growth sending the planet straight into the chipper.)
User avatar
SwissTbone
Posts: 1061
Joined: Thu Mar 22, 2018 11:40 pm
Contact:

Re: Production wait times

Post by SwissTbone »

Burgerbob wrote: Sat Dec 25, 2021 8:08 am
harrisonreed wrote: Fri Dec 24, 2021 9:38 pm

What, he is too stuck up to take on an apprentice?
This is exactly why the constant growth capitalism model is so insidious. There's no reason this guy needed to expand and make more flutes, but we all feel like he should because...?
Absolutely! This guy is having the time of his life building flutes the way he wants to build them. And it seems to me he makes enough money doing that to live comfortably.

Why should he expand or take an apprentice! To make more money? He would lose some control of what he is doing. Having an apprentice or expanding means more administrative work etc etc.

It may seem egoistic not transmitting his wisdom. But why should he care? He just does his thing and it seems to work for him. I'd probably do the same.
ƒƒ---------------------------------------------------ƒƒ
Like trombones? Head over to https://swisstbone.com/ to see some great vintage and custom horns!
OneTon
Posts: 666
Joined: Tue Nov 02, 2021 11:44 am

Re: Production wait times

Post by OneTon »

Dennis wrote: Sat Dec 25, 2021 8:29 am
OneTon wrote: Thu Dec 23, 2021 8:29 pm One of the problems with sending rank amateurs on the Challenger mission was that rank amateurs have no way to understand the risks of the mission, as might be expected of a career military pilot. It later turned out that NASA had got it wrong as well when the tiles were falling off and damaging the wing on acquiring their orbit. In any case, military pilots tended to know the history of the F-105, why it was called the “Thud,” and the limitations of technology at a given time. A military pilot could assess the dangers of making a space flight. A civilian might not.

Before I blame a supplier for not having a crystal ball, I would be asking myself what was my responsibility in this event. Did I not listen? Did I only hear what I wanted to here. Did I write out a case study to determine what were the risks and their impacts to the desired goal? If I did not, what would it have looked like had I done so?

Am I a good customer?
(Emphasis added)

You have your shuttle disasters mixed up. Challenger was the solid rocket booster (SRB) failure, Columbia was the re-entry disaster due to wing damage.

The Challenger incident was actually much worse than you suggest. If you'd like a scientist's assessment devoid of bureaucratic input and control, read Feynman's What Do You Care What Other People Think?. (The second half of the book is about the Challenger disaster and the Rogers Commission.) The bottom line is that NASA and Thiokol engineers knew that there were serious problems with the SRBs, and communicated those problems to NASA management. They knew the dangers were increased at low temperatures and attempted to scrub the launch: there was ice on the SRBs. NASA's management overruled the engineers. The net result was seven dead astronauts, including a schoolteacher.

Feynman felt that his estimated probability of a catastrophic launch failure of around 1/100 was an acceptable failure rate. His primary objection was to NASA completely fictitious assessment of 1/100,000 being presented to non-professionals as an argument from authority (trust us, we're professionals and we know what we're doing). Basically, he felt they should have told McAuliffe (and everyone else) that there was a 1% chance of the thing blowing up, and allowed her (and everyone else) to make their own decisions.

The Columbia disaster showed that NASA still had a long way to go in cleaning up its act.

In response to your last question, yes, you are a good customer.
Dennis,

I wasn’t confused but what I wrote was extremely confusing. Thank you for bringing out the paradigm shift that I was trying to extract from the two separate events. And thanks for the reference. I will try to a copy.

Richard
Richard Smith
Wichita, Kansas
Post Reply

Return to “Instruments”